Building U-02
Italy Cluster, Dubai · by Nakheel Properties
At a glance
The building is a 5-storey mixed-use building by Nakheel with Mediterranean design. It stands in Italy Cluster, International City. The building contains studio and one-bedroom apartments alongside shops. Amenities include laundry facilities, parking, a restaurant, a salon and a supermarket. Apartment outlooks include internal courtyards and surrounding community streets. Al Awir Road and Sheikh Mohammed Bin Zayed Road (E311) connect the community to other Dubai districts. The building is ready, with handover in Q4 2007.
Prices & trends
Median sale prices
Latest recorded median: AED 570K
Median annual rents
Latest recorded median: AED 40K
Market figures are indicative and shown only where records are available in the building data.
Recent transactions
| Date | Record | Type | Bedrooms | Size | Price | Price / sq ft |
|---|---|---|---|---|---|---|
| 07 Oct 2026 | Title Deed | Apartment | Studio | 484 sq ft | AED 280K | AED 579 |
| 29 May 2025 | Title Deed | Apartment | Studio | 484 sq ft | AED 315K | AED 651 |
| 03 Mar 2025 | Title Deed | Apartment | Studio | 484 sq ft | AED 310K | AED 640 |
| 03 Feb 2025 | Title Deed | Apartment | Studio | 484 sq ft | AED 250K | AED 517 |
| 27 Jan 2025 | Title Deed | Apartment | Studio | 484 sq ft | AED 300K | AED 620 |
| 23 Jan 2025 | Title Deed | Apartment | Studio | 484 sq ft | AED 290K | AED 599 |
| 28 Oct 2024 | Title Deed | Apartment | Studio | 484 sq ft | AED 260K | AED 537 |
| 06 May 2026 | Title Deed | Apartment | 1 B/R | 732 sq ft | AED 437.5K | AED 598 |
| 17 Apr 2026 | Title Deed | Apartment | 1 B/R | 732 sq ft | AED 430K | AED 587 |
| 14 Nov 2025 | Title Deed | Apartment | 1 B/R | 732 sq ft | AED 330K | AED 451 |
| 23 Jul 2025 | Title Deed | Apartment | 1 B/R | 732 sq ft | AED 387K | AED 529 |
| 10 Mar 2025 | Title Deed | Apartment | 1 B/R | 732 sq ft | AED 405K | AED 553 |
| 23 Dec 2024 | Title Deed | Apartment | 1 B/R | 732 sq ft | AED 370.3K | AED 506 |
| 08 Oct 2026 | Title Deed | Shop | — | 710 sq ft | AED 795K | AED 1,120 |
| 19 Dec 2024 | Title Deed | Shop | — | 431 sq ft | AED 495K | AED 1,148 |
| Date | Record | Type | Bedrooms | Size | Annual rent | Rent / sq ft |
|---|---|---|---|---|---|---|
| 26 Sep 2026 | Rental | Apartment | Studio | 484 sq ft | AED 28K | — |
| 22 Sep 2026 | Rental | Apartment | Studio | 484 sq ft | AED 33.4K | — |
| 25 Aug 2026 | Rental | Apartment | Studio | 484 sq ft | AED 29.5K | — |
| 20 Jul 2026 | Rental | Apartment | Studio | 484 sq ft | AED 29K | — |
| 20 Jun 2026 | Rental | Apartment | Studio | 484 sq ft | AED 25.2K | — |
| 19 Oct 2026 | Rental | Apartment | 1 B/R | 732 sq ft | AED 36K | — |
| 12 Oct 2026 | Rental | Apartment | 1 B/R | 732 sq ft | AED 38K | — |
| 01 Oct 2026 | Rental | Apartment | 1 B/R | 732 sq ft | AED 42K | — |
| 01 Sep 2026 | Rental | Apartment | 1 B/R | 732 sq ft | AED 36K | — |
| 17 Aug 2026 | Rental | Apartment | 1 B/R | 732 sq ft | AED 40K | — |
| 12 Jul 2026 | Rental | Apartment | 1 B/R | 732 sq ft | AED 45K | — |
| 22 Jun 2026 | Rental | Apartment | 1 B/R | 732 sq ft | AED 41K | — |
| 21 Jun 2026 | Rental | Apartment | 1 B/R | 732 sq ft | AED 40K | — |
| 12 Sep 2026 | Rental | Shop | Shop | 614 sq ft | AED 55.4K | — |
| 27 Jun 2026 | Rental | Shop | Shop | 517 sq ft | AED 53.5K | — |
Building FAQs
Where in Dubai is Building U-02 located?
Al Warsan First is the district containing Building U-02 in International City. Approximate driving times are 21 minutes to Downtown Dubai or Dubai Mall and 17 minutes to Dubai International Airport under normal traffic conditions.
Which themed cluster contains Building U-02 in International City?
Italy Cluster contains Building U-02, giving it a Mediterranean architectural setting. Its classic European low-rise facades have warm-toned exterior finishes, with landscaped spaces surrounding the residential blocks.
What apartment types and commercial units does Building U-02 have?
Studios, one-bedroom apartments and shops make up Building U-02's residential and commercial uses. Elevators serve the residential floors, and the apartment interiors use functional layouts within the low-rise structure.
Who built Building U-02 and how established is the developer?
Nakheel built Building U-02 and was founded in 2003. The developer has completed 53 projects, with its recorded deliveries beginning in 2006 and extending to 2026, and operates under Dubai Holding.
When did construction and handover happen for Building U-02?
Construction started in 2003, followed by handover in Q4 2007 for Building U-02. Its construction is 100 percent complete, and both its development status and sales status are completed.
What community facilities are available around Building U-02?
Landscaped courtyards, green spaces and children's play areas surround Building U-02. Security measures include CCTV surveillance, while surface and covered parking options are available around the wider Italy Cluster.
What surroundings can apartments in Building U-02 overlook?
Cluster walkways are among the outlooks from Building U-02. Its low-rise position produces neighbourhood views, with paths between the surrounding cluster buildings forming part of the apartment surroundings.